2008-09 Construction Bid Price Examples
*Sample bid estimates are based on bids
from California licensed contractors only. Contractors who were
unable to start the job for 120 days, or did not provide complete
estimates were not included. Bids are for comparison value only, You should always choose a licensed contractor who you feel comfortable with, has qualified experience, references and best suits your project.
Residential Concrete Estimates for Patio, Driveway, and Small
Pad
Sample bid specifics
Driveway
Job Location -Residence Driveway Fremont
Site Access- Easy access and parking
Work area - existing asphalt driveway
Job Description- Driveway 16' x 24' 384 sq ft
Concrete Finish type -
Brushed concrete finish
Color - No
Concrete Stamp- No stamp or pattern finish requirements
4" slab. Reinforcement using 16"OC rebar 1/2"
Engineering - No
Design or Plans provided - No
Bids received - 5
Qualified Bids - 4
Low bid $5,500
High bid $8,370
Job duration range 3-10 days
Comments- *One of the concrete contractors for this job mentioned that baserock would need to be put down first and would require added excavation, this was not confirmed for all other bids.
Stamped Concrete Patio
Job Location -Residence Backyard Hayward Hills
Site Access- Easy access and parking
Work area - existing lawn area
Job Description- Excavate lawn area, remove, re-route, and terminate existing irrigation add new patio area 752 Sq Ft ( freeform rounded shape)
Concrete Finish type -
Stamped Random Stone
Color - 2 colors ( Plum and Taupe )
Concrete Stamp- Random Stone
4" slab. Reinforcement using 16"OC rebar 3/8 "
Engineering - No
Design or Plans provided - simple sketch ( very simple!)
Bids received - 3
Qualified Bids - 3
Low bid $12,125
High bid $16,000
Job duration range 7-12 days
Comments- *Although we heard a lot of suggestions, we stuck to the plan and finally got 3 contractors to give us bids. We discussed Sealing the Concrete with the first contractor and mentioned it to all others in fairness of price. All 3 qualifying bids here did not include sealing and said the concrete must first cure before applying a sealant. Sealing prices averaged about $1.60/ft
Small Concrete Pad
Job Location -Residence Backyard Berkeley
Site Access- Easy access and parking
Work area - grass area
Job Description- Excavate grass area, install 8'x10' Concrete Pad
Concrete Finish type -
Level pad
Color - NO
Concrete Stamp- No
4" slab. Reinforcement using wire mesh "
Engineering - No
Design or Plans provided - No
Bids received - 4
Qualified Bids - 3
Low bid $1,350
High bid $1,890
Job duration range 2-5 days
Comments- *Since this was for a backyard shed all contractors agreed to include bolts or provided fasteners in the corners of the slab
Redwood Decking
Decking options have changed over
the years and now many decks are built using composite lumber that has a longer life, does not require staining, and does not splinter. The higher
price initially can make up the difference of maintenance cost in about 3 yrs. We recieved bids for the same deck plan using both Redwood and Trex (Trex seems to be the most popular brand of composite decking)
New Backyard Redwood Deck
Job Location -Residence Backyard Dublin
Site Access- Easy access and parking
Work area - empty back lot on slight slope
Job Description- Construct New back patio deck- requires minimal excavation at house level for sub structure and deck is raised approx 7' from level of slope
Deck size 522 Sq/ft
Deck Shape- L shape
Board Pattern - Straight Parallel to the house
Substructure- 2x6 Treated
Stairs - No
Fasteners- Deck Screws
Railings - 46 LFT (Linear Ft) 40" Height
Railing Design - Pickett
Stain- Behr Natural
Engineering - No
Design or Plans provided - No
Bids received - 7
Qualified Bids - 4
Low bid $16,940
High bid $19,745
Job duration range 10-21 days
Comments- *Some of the same contractors provided bids for both redwood and trex materials.
Two contractors mentioned that the Trex railing system was expensive and recommended other railing options including wood, aluminum or a combination of trex and wood.
Trex Decking
New Backyard Trex Deck
Job Location -Residence Backyard Dublin
Site Access- Easy access and parking
Work area - empty back lot on slight slope
Job Description- Construct New back patio deck- requires minimal excavation at house level for sub structure and deck is raised approx 7' from level of slope
Deck size 522 Sq/ft
Deck Shape- L shape
Board Pattern - Straight Parallel to the house
Substructure- 2x6 Treated
Fasteners- Composite Deck Screws
Railings - 46 LFT (Linear Ft) 40" Height
Railing Design - Trex Railing
Stain- No
Engineering - No
Design or Plans provided - No
Bids received - 7
Qualified Bids - 3
Low bid $17,800
High bid $22,000
Job duration range 10-21 days
Comments- *Some of the same contractors provided bids for both redwood and trex materials.
Two contractors mentioned that the Trex railing system was expensive and recommended other railing options including wood, aluminum or a combination of trex and wood.
Bay
Area Contractors
Sponsored Listings (click here to add your company to this page)
Santay Construction
Hayward, Ca 94542
Tel: 510 461-0424
Concraft Construction
San Leandro, Ca 94542
Ramos Landscaping
Oakland Ca
510 228-7950
|